IBM Technology Partner, Partner Plus Gold tierBuilt and validated on IBM LinuxONEGenerally available August 31, 2026
WHAT YOU SEE ON DAY ONE

First sign-in to your own tenant. The dashboard stays gated until your board seals the first baseline.

Churchill first sign-in screen: the dashboard stays gated until a Change Advisory Board is stood up and the baseline is sealed
STATIC SCREENSHOT · CHURCHILL CONSOLE · FIRST SIGN-IN · SETUP RUNS ONCE dashboard gated until the baseline is sealed
30-DAY EVALUATION · NON-PRODUCTION

Prove it on your own workload.

Churchill is generally available August 31, 2026. From that date you download it directly from this site, a protected download with the install and uninstall guides and the technical whitepaper alongside it. Register now and we will tell you when it goes live. Self-serve if you can provision your own lab host; the regulated-institution path below if you cannot.

{{ f.n }} {{ f.t }}
WHAT WE NEED FROM YOU

One non-production Linux host and one application you would rather not have changed without your signature. Start on one host. Add more only once your team is satisfied with what it refuses.

REGISTRATION RECEIVED

Check your inbox.

{{ confirmLine }}

You are registered. From August 31 you can download Churchill from this site whenever you are ready, with both guides alongside it. The whitepaper is available now, without waiting. A WestGate engineer follows up within one business day, and a walkthrough is there if you want one, not a step you have to clear first.

REQUEST ACCESS

We use this to prepare your evaluation and nothing else. No newsletter, no third-party sharing.

SECOND DOOR · REGULATED INSTITUTIONS

You cannot download a kernel-level binary onto a bank asset, and we know it.

Self-serve download suits a team that can provision its own lab host this afternoon. If you are at a bank, an insurer, or a hospital system, the path runs through vendor risk, an evaluation agreement, a lab host, and a firewall exception, and it takes weeks rather than minutes. That path exists here too, and we will start it before you ask.

{{ r.n }} {{ r.t }}
FOR WHOEVER WRITES THE VENDOR-RISK MEMO

This evaluation is not a deployment, and the memo should not have to say it is.

Thirty days, non-production, on a lab host your team provisions and controls. No production system is in scope, no change to a production deploy path is requested, and nothing needs a committee to approve a lab. Removal is straightforward if the answer is no, with the uninstall guide included. Financial-viability and continuity questions belong in the pack above, before any conversation about production begins.

Select the regulated-institution path in the form and you get the pack, not a sequence of sales emails.

IBM Technology Partner mark
IBM TECHNOLOGY PARTNER · PARTNER PLUS GOLD TIER

Churchill is built and validated on IBM LinuxONE.

© 2026 WestGate Data Science. All rights reserved.